A practical guide to planning permission, development rights, application paperwork, local decisions and appeals across the UK—without pretending every council follows identical rules.
Authority rules vary by location · No online application or approval services on this site
What matters first
Choose the planning question you actually need answered
A planning search usually starts with a very specific question: “Can I extend my house?”, “Where do I submit drawings?”, or “Can I object to a neighbour’s application?” Select the next action instead of searching an anonymous directory.
Do I need permission?
Understand permitted development, property restrictions, conservation areas and building regulations.
I’m ready to apply
Prepare the correct application, plans, documents, fees and council validation checklist.
A decision or neighbour issue
Find out how to read decisions, comment on proposals, consider an appeal or report possible unauthorised work.
Four nations, different planning rules
UK planning permission is not one identical system. England, Wales, Scotland and Northern Ireland have distinct legal frameworks, application services and appeal arrangements. Start with the correct nation and relevant council.
England
Check your local planning authority, permitted development rights, planning history and any Article 4 direction.
Wales
Use Welsh Government guidance and the relevant local planning authority; do not reuse England-only permitted development limits.
Scotland
Work with the planning authority and ePlanning Scotland; householder and heritage rules differ from England.
Northern Ireland
Consult your council and the NI Planning Portal. Mid Ulster operates its own portal for some planning functions.
Interactive planning research starting point
This browser-only guide helps you identify the appropriate official starting page. It does not decide whether your development is lawful or submit an application.
Your project, your planning authority
Choose a nation and project type. The recommendation changes without sending your selections to this website.
Use the relevant government planning guidance and confirm with the local planning authority.
England planning guidance →The real-world planning route
These checkpoints are more useful than a fixed timeline because only a valid application can start the relevant determination period, and some applications need specialist information.
Illustrative route — not a live council application tracker
- 1 Define project
- 2 Check restrictions
- 3 Prepare plans
- 4 Submit & validate
- 5 Read decision
Before submission
Check property status, local planning policies, ownership certificates and the correct form.
During determination
Monitor validation, consultation and requests for additional information; note any agreed extension.
After decision
Read every condition, approved drawing and time limit before starting works.
Which permission or approval are you dealing with?
| Question | Planning permission | Other permission / checks |
|---|---|---|
| Can I extend or alter a home? | Householder permission may be needed; permitted development can sometimes apply. | Building regulations, party wall matters, listed building consent and site restrictions may still matter. |
| Can I convert a loft? | Roof alterations may need planning permission or fall within permitted development limits. | Building control, fire safety, structural design and possible Party Wall etc. Act procedures. |
| Can I change a shop into another use? | Check material change of use, use classes and any permitted development/prior approval route. | Licensing, advertisement consent, fire safety, access and building control. |
| Can I build on land? | New buildings generally need a planning assessment and possibly full permission. | Drainage, highways, ecology, heritage, building standards, utilities and land rights. |
| Can I work on a listed building? | Planning permission may be needed depending on the proposal. | Listed building consent can be necessary independently; unauthorised works can be serious. |
Quick answers before you spend money
Does every extension require planning permission?
No. Some projects can qualify as permitted development, but the rights have specific conditions and can be restricted by location, property type or prior decisions. Confirm using the correct nation’s guidance.
Is planning permission the same as building regulations approval?
No. Planning focuses on acceptable development and land-use impacts; building regulations concern technical requirements such as structure, fire safety and energy performance. A project may need both, one, or neither depending on the work.
Can this website search live planning applications?
No live council database is integrated here. Use the planning authority’s register or the official Northern Ireland Planning Portal to view actual applications, drawings and decisions.
Can I rely on an advertised “automatic approval” timeframe?
No. Timetables depend on the application type, validation and jurisdiction; extensions and other statutory procedures may apply. Verify official notices and never treat the expiry of a general timetable as a grant of permission.
Primary sources & verification notes
Use the linked guidance to confirm current rules. The responsible council or planning authority has the facts about your location, design constraints and any restrictions that apply to your property.
↗ GOV.UK planning permission in England and Wales
↗ GOV.UK when permission is required
↗ GOV.WALES applying for permission
Reference links reviewed for this publication on 25 November 2026. This is not an audit of every council page or a live status feed.
Ready to check the rules?
A practical first check before submitting a planning application.